Providing the detailed engineering design to replace the existing AVR panel of 6 Sub-transmission substation in Southern Operating Area. The project also includes the necessary modifications/ additions to the protection, control, communication, SCADA and associated equipment.
a. ASIR HOSPITAL 33 / 13.8 kV Substation
b. WADI BIN HASHBEL 33/13.8 kV Substation
c. LAJWAN 33/13.8 kV Substation
d. NAFIA 33/13.8 kV Substation
e. Al-Soghra 33/13.8 kV Substation
f. Al- Zafeer 33/13.8 kV SubstationAfrica.