The PROJECT will construct a new 132/13.8kV indoor GIS type Substation, arranged in a single bus single
breaker (SBSB) configuration in NAJRAN area. The new Substation which shall be installed by this
PROJECT will be fed at 132kV through NEW 132KV DOUBLE CIRCUITS (D/C) Overhead Transmission
Line (OHTL) with 132kV D/C UGC portion from NAJRAN UNIVERSITY BSP 132kV Substation. Najran
Cement factory substation shall be equipped with Substation Automation System (SAS) and will be remotely
controlled from the COMPANY Power Control Center (PCC) through SCADA system, Communication
system and gateway. It shall also be equipped with a 132 KV Static Synchronous Compensator System
(STATCOM)