The project aims to integrate the proposed REPLACEMENT OF EXISTING WOODEN POLES
115KV OHTL BETWEEN SHEDGUM-2 BSP, HIE 1, UYUN & JAWATHA BSP SUBSTATIONS
involving the following works:
Installation of New 115 kV UG Cables (UG Cables Portion)
Disconnecting existing 115 kV UG Cable link for future use
Installation of New OHTL (OHTL Portion)
Conversion of Wooden Poles to Steel Structure (OHTL Portion)
Dismantling of Wooden Pole OHTL (OHTL Portion