S/N Project Name Client Owner Area Status Type Voltage Level
1 CONSTRUCTION OF 380kV U/G CABLE FROM TRANSITION YARD (NEAR DAMMAM NTH) TO RAMES BSP (CKTS 1&2) TDP SEC Eastern Ongoing Underground Cable 380
2 INSTALLATION OF 380KV DISCONNECT SWITCHES AT JAM, MHR, ADL, LTH, FSL & YNB-3 380kV SUBSTATIONS IN WOA Al-Ojaimi SEC Centeral Ongoing Substations 380
3 INSTALLATION OF 380KV DISCONNECT SWITCHES AT JAM, MHR, ADL, LTH, FSL & YNB-3 380kV SUBSTATIONS IN WOA Al-Ojaimi SEC Western Ongoing Substations 380
4 CONSTRUCTION OF A NEW 110/33/13.8 KV SUBSTATION FOR NATIONAL AQUACULTURE GROUP (NAQUA), Al Lith City Elsewedy Electric NG Western Ongoing Substations 110
5 132-13.8kV NAJRAN CEMENT FACTORY PROJECT In NAJRAN Area Mastoura NG Southern Ongoing Substations 132
6 CONSTRUCTION OF NORTH MUBARRAZ 115/13.8kV SS GRIENIA NG Western Ongoing Substations 115
7 REFURBISHMENT OF AL- HAQU SUBSTATION IN SOA JAL International NG Southern Ongoing Substations 132
8 REFURBISHMENT OF AL- KHANIQ SUBSTATION IN SOA JAL International NG Southern Ongoing Substations 132
9 REFURBISHMENT OF BAHA TOWN SUBSTATION IN SOA JAL International NG Southern Ongoing Substations 132
10 CONNECTION OF WATER PUMPING PROJECT S/S 8330 WITH 132KV NETWORK, IN RIYADH CITY EDRAK NG Centeral Ongoing Underground Cable 132
11 CONNECTION OF NEW AL KHARJ HOUSING PROJECT S/S # 8730 WITH 132KV NETWORK, IN AL KHARJ AREA AL-MAIYAL NG Centeral Ongoing Underground Cable 132
12 CONSTRUCTION OF NEW 132kV DC OHL FROM BSP SS 9063 UP TO NEW SS 8536 IN NISAH HAIF NG Centeral Ongoing Overhead Lines 132
13 CONSTRUCTION OF NEW 132kV DC OHL FROM BSP SS 9040 UP TO NEW SS 8537 IN MARAT AREA (OHTL) HAIF NG Centeral Ongoing Overhead Lines 132
14 132kV D/C OHTL FROM WA’AD AL-SHAMAL 380/132kV BSP TO MA’ADEN BENEFICIATION PLANT 132/13.8kV SUBSTATION AL-SHERIF NG Eastern Ongoing Overhead Lines 132
15 Supply and Installation of 132kV Submarine, Land and FO Cable and Ancillary Equipment for Madaya – Farasan Cable Project Al Gihaz SEC Southern Ongoing Underground Cable 132
16 POWER SUPPLY TO DANA 115/13.8kV SUBSTATION #2 IN DAMMAM AREA Al Gihaz NG Eastern Ongoing Overhead Lines 115
17 KHOBAR CORNICHE 115/13.8kV SUBSTATION (115KV UNDERGROUND CABLES PORTION) Al Gihaz NG Eastern Ongoing Underground Cable 115
18 POWER SUPPLY TO WADI AL-DHAHRAN 115/13.8kV SUBSTATION IN DAMMAM AREA (UNDERGROUND CABLE PORTION) Al Gihaz NG Eastern Ongoing Underground Cable 115
19 NORTH KHOBAR DISTRICT 115/13.8kV SUBSTATION (U/G PORTION) Al Gihaz NG Eastern Ongoing Underground Cable 115
20 CONNECTION OF AL NAZEEM S/S 8271, WITH 132KV NETWORK, IN RIYADH CITY TDP NG Centeral Ongoing Overhead Lines 132
21 RELIABILITY ENHANCEMENT OF BSP 9014, 9017 & 9027 WITH 132KV NETWORK IN RIYADH AREA. (132kV UNDERGROUND CABLES PORTION) TDP NG Central Ongoing Underground Cable 132
22 RELIABILITY ENHANCEMENT OF BSP 9014, 9017 & 9027 WITH 132KV NETWORK IN RIYADH AREA. (132kV UNDERGROUND CABLES PORTION) TDP NG Central Ongoing Underground Cable 132
23 RELIABILITY ENHANCEMENT OF BSP 9014, 9017 & 9027 WITH 132KV NETWORK IN RIYADH AREA. (132kV UNDERGROUND CABLES PORTION) TDP NG Central Ongoing Underground Cable 132
24 REPLACEMENT OF EXISTING 132KV OIL FILLED CABLES BY XLPE U/G CABLES FOR INTERCONNECTION BETWEEN S/S 8100 & S/S 8102, IN RIYADH AREA (132kV UNDERGROUND CABLES PORTION) Al Nowaiser NG Central Ongoing Underground Cable 132
25 REPLACEMENT OF EXISTING 132KV OIL FILLED CABLE BY XLPE U/G CABLES FOR INTERCONNECTION BETWEEN S/S 8005 & S/S 8074 IN RIYADH AREA (132kV UNDERGROUND CABLES PORTION) Al Nowaiser NG Central Ongoing Underground Cable 132
26 CONSTRUCTION OF A NEW 110/13.8KV SUBSTATION (KHULAIS-2) IN MAKKAH UNDER NETWORK REINFORCEMENT PROGRAM FOR BIG CITIES (OHTL/UGC) Al-Gihaz NG Western Ongoing Overhead Lines 110
27 CONSTRUCTION OF 110/13.8KV SUBSTATION KHULAIS-2 & 110kV INTERCONNECTION IN MAKKAH UNDER NETWORK REINFORCEMENT (SUBSTATION PORTION) Al-Gihaz NG Western Ongoing Substations 110
28 CONSTRUCTION OF NEW PROPOSED 110KV UGC DOUBLE CIRCUIT FROM EXISTING MADINAH CENTER BSP (MDC) TO PROPOSED SHORAN -2 S/S Al-Sharif NG Western Ongoing Underground Cable 110
29 CONSTRUCTION OF AL NIMAR-2 SUBSTATION SS#8377 WITH 132KV NETWORK IN RIYADH Al-Sharif NG Central Ongoing Underground Cable 132
30 CONSTRUCTION OF AL RIMAL SUBSTATION SS#8272 WITH 132KV NETWORK IN RIYADH Al-Sharif NG Central Ongoing Underground Cable 132
31 CONSTRUCTION OF AL YASMEEN SUBSTATION SS#8214 WITH 132KV NETWORK IN RIYADH Al-Sharif NG Central Ongoing Underground Cable 132
32 CONSTRUCTION OF AL MARWA SUBSTATION SS#8286 WITH 132KV NETWORK CONNECTION Al-Sharif NG Central Ongoing Underground Cable 132
33 UPGRADE OF PROTECTION SYSTEM AT 230KV SHEDGUM PP IN AL-HASSA AREA JAL International NG Eastern Ongoing Substations 230
34 REFURBISHMENT OF 43BD JUBAIL NORTHEAST SUBSTATION JAL International NG Eastern Ongoing Substations 115
35 REFURBISHMENT OF SWGR FOR 6 SUBSTATIONS IN JEDDAH-RFX SUBSTATIONS IN JEDDAH Al-Fanar NG Eastern Ongoing Substations 110
36 REINFORCEMENT OF 132/33KV SS 8919 & 8922 IN HAIL Al-Nowaiser NG Central Ongoing Substations 132
37 REFURBISHMENT OF HAFAR AL BATIN-1 SUBSTATION IN EASTERN OPERATING AREA Nour Energy NG Eastern Ongoing Substations 115
38 DESIGN AND ENGINEERING WORKS REPLACEMENT OF EXISTING WOODEN POLES 115 KV OVERHEAD TRANSMISSION LINES BETWEEN JAWATHA BSP, QARN, SHUBAH & Al-Haider NG Eastern Ongoing Underground Cable 115
39 DESIGN AND ENGINEERING WORKS REPLACEMENT OF EXISTING WOODEN POLES 115KV OVERHEAD TRANSMISSION LINES BETWEEN SHEDGUM-2 BSP, HIE 1, UYUN & Al-Haider NG Eastern Ongoing Underground Cable 115
40 DESIGN AND ENGINEERING WORKS REPLACEMENT OF EXISTING WOODEN POLES 115KV OVERHEAD TRANSMISSION LINES BETWEEN SHEDGUM-2 BSP, HIE 1, UYUN & JAWATHA BSP SUBSTATIONS Al-Haider NG Eastern Ongoing Underground Cable 115
41 DESIGN AND ENGINEERING WORKS REPLACEMENT OF EXISTING WOODEN POLES 115KV OVERHEAD TRANSMISSION LINES BETWEEN SHEDGUM-2 BSP, HIE 1, UYUN & Al-Haider NG Eastern Ongoing Substations 115
42 DESIGN AND ENGINEERING WORKS REPLACEMENT OF EXISTING WOODEN POLES 115KV OVERHEAD TRANSMISSION LINES BETWEEN KHURAIS & RWPS 4C SUBSTATIONS IN AL Al Haider NG Eastern Ongoing Underground Cable 115
43 DESIGN AND ENGINEERING WORKS REPLACEMENT OF EXISTING WOODEN POLES 115KV OVERHEAD TRANSMISSION LINES BETWEEN KHURAIS & RWPS 4C SUBSTATIONS IN AL Al Haider NG Eastern Ongoing Substations 230
44 DESIGN AND ENGINEERING WORKS REPLACEMENT OF ABQAIQ S49 COMMUNITY 115 KV TRANSMISSION LINE Al Haider NG Eastern Ongoing Underground Cable 115
45 EPC of Primary Electrical Substation # 1, 2, CC1 and CC2 (380/115/33kV) in Ras El Khair Royal Commission NG Eastern Completed Substations 380
46 EPC of Primary Electrical Substation # 3 (380/115/33kV) in Ras El Khair Royal Commission NG Eastern Completed Substations 380
47 EPC of 115/13.8kV Substation 26BD (021‐C28) Royal Commission NG Eastern Completed Substations 115
48 Construction of new 33/13.8 S/S Sulahi at abha Giza Systems NG Southern Completed Substations 33
49 Construction of new 33/13.8 S/S 7826 at Hail ETAC NG Northern Completed Substations 33
50 Design Reinforcement of 110kv line feeder from south Azizia to university Substations (SAZ TO UNIV), Area Saudi Arabia; West BEMCO NG Western Completed Overhead Lines 110
51 Replacement of 33/13.8KV, 10 MVA Power Transformer at S/S# 7031,7062,7125 by 20 MVA, 33/13.8KV, Ynyno Power Transformer EPI NG Eastern Completed Substations 33
52 Upgrading of Transformer Protection Relays in Jubail South East Substation 230/115 kV (#T771, #T741,#T761, #T716) , Jubail Area, Saudi Arabi ETAC NG Southern Completed Substations 230
53 Replacement of 33KV & 13.8KV Switchgears at S/S # 7812 Riyadh Area. ETAC NG Centeral Completed Substations 33
54 Replacement of 33KV & 13.8KV Switchgears at S/S # 7816 Riyadh Area. ETAC NG Centeral Completed Substations 33
55 Design Reinforcement of S/S #7803 & S/S #7804, Saudi Arabia ETAC NG Centeral Completed Substations 33
56 Replacement of 13.8 kV Fuji Panels at Substation S/S #8082, Saudi Arabia ETAC NG Centeral Completed Substations 13.8
57 Replacement of 13.8KV SWGR for 33/13.8KV‐S/S #7780 & 7751 ETAC NG Centeral Completed Substations 33
58 Replacement of AVR Systems for Distribution Substations at Asir and Jazan Regions: a)ASIR HOSPITAL 33 / 13.8 kV Substation ETAC NG Southern Completed Substations 33
59 Replacement of AVR Systems for Distribution Substations at Asir and Jazan Regions: b)WADI BIN HASHBEL 33/13.8 kV Substation ETAC NG Southern Completed Substations 33
60 Replacement of AVR Systems for Distribution Substations at Asir and Jazan Regions: c)LAJWAN 33/13.8 kV Substation ETAC NG Southern Completed Substations 33
61 Replacement of AVR Systems for Distribution Substations at Asir and Jazan Regions: d)NAFIA 33/13.8 kV Substation ETAC NG Southern Completed Substations 33
62 Replacement of AVR Systems for Distribution Substations at Asir and Jazan Regions: f)Al‐ Zafeer 33/13.8 kV Substation ETAC NG Southern Completed Substations 33
63 Construction of new El‐Koam El‐Ahmer 220/66 KV GIS Electrical Substation Egyptian Electricity Holding Company EETC Egypt Completed Substations 220
64 Construction of new Colangeel 66/11KV AIS Electrical Substation Project Egyptian Electricity Holding Company EETC Egypt Completed Substations 66