| S/N | Project Name | Client | Owner | Area | Status | Type | Voltage Level |
|---|---|---|---|---|---|---|---|
| 1 | CONSTRUCTION OF 380kV U/G CABLE FROM TRANSITION YARD (NEAR DAMMAM NTH) TO RAMES BSP (CKTS 1&2) | TDP | SEC | Eastern | Ongoing | Underground Cable | 380 |
| 2 | INSTALLATION OF 380KV DISCONNECT SWITCHES AT JAM, MHR, ADL, LTH, FSL & YNB-3 380kV SUBSTATIONS IN WOA | Al-Ojaimi | SEC | Centeral | Ongoing | Substations | 380 |
| 3 | INSTALLATION OF 380KV DISCONNECT SWITCHES AT JAM, MHR, ADL, LTH, FSL & YNB-3 380kV SUBSTATIONS IN WOA | Al-Ojaimi | SEC | Western | Ongoing | Substations | 380 |
| 4 | CONSTRUCTION OF A NEW 110/33/13.8 KV SUBSTATION FOR NATIONAL AQUACULTURE GROUP (NAQUA), Al Lith City | Elsewedy Electric | NG | Western | Ongoing | Substations | 110 |
| 5 | 132-13.8kV NAJRAN CEMENT FACTORY PROJECT In NAJRAN Area | Mastoura | NG | Southern | Ongoing | Substations | 132 |
| 6 | CONSTRUCTION OF NORTH MUBARRAZ 115/13.8kV SS | GRIENIA | NG | Western | Ongoing | Substations | 115 |
| 7 | REFURBISHMENT OF AL- HAQU SUBSTATION IN SOA | JAL International | NG | Southern | Ongoing | Substations | 132 |
| 8 | REFURBISHMENT OF AL- KHANIQ SUBSTATION IN SOA | JAL International | NG | Southern | Ongoing | Substations | 132 |
| 9 | REFURBISHMENT OF BAHA TOWN SUBSTATION IN SOA | JAL International | NG | Southern | Ongoing | Substations | 132 |
| 10 | CONNECTION OF WATER PUMPING PROJECT S/S 8330 WITH 132KV NETWORK, IN RIYADH CITY | EDRAK | NG | Centeral | Ongoing | Underground Cable | 132 |
| 11 | CONNECTION OF NEW AL KHARJ HOUSING PROJECT S/S # 8730 WITH 132KV NETWORK, IN AL KHARJ AREA | AL-MAIYAL | NG | Centeral | Ongoing | Underground Cable | 132 |
| 12 | CONSTRUCTION OF NEW 132kV DC OHL FROM BSP SS 9063 UP TO NEW SS 8536 IN NISAH | HAIF | NG | Centeral | Ongoing | Overhead Lines | 132 |
| 13 | CONSTRUCTION OF NEW 132kV DC OHL FROM BSP SS 9040 UP TO NEW SS 8537 IN MARAT AREA (OHTL) | HAIF | NG | Centeral | Ongoing | Overhead Lines | 132 |
| 14 | 132kV D/C OHTL FROM WA’AD AL-SHAMAL 380/132kV BSP TO MA’ADEN BENEFICIATION PLANT 132/13.8kV SUBSTATION | AL-SHERIF | NG | Eastern | Ongoing | Overhead Lines | 132 |
| 15 | Supply and Installation of 132kV Submarine, Land and FO Cable and Ancillary Equipment for Madaya – Farasan Cable Project | Al Gihaz | SEC | Southern | Ongoing | Underground Cable | 132 |
| 16 | POWER SUPPLY TO DANA 115/13.8kV SUBSTATION #2 IN DAMMAM AREA | Al Gihaz | NG | Eastern | Ongoing | Overhead Lines | 115 |
| 17 | KHOBAR CORNICHE 115/13.8kV SUBSTATION (115KV UNDERGROUND CABLES PORTION) | Al Gihaz | NG | Eastern | Ongoing | Underground Cable | 115 |
| 18 | POWER SUPPLY TO WADI AL-DHAHRAN 115/13.8kV SUBSTATION IN DAMMAM AREA (UNDERGROUND CABLE PORTION) | Al Gihaz | NG | Eastern | Ongoing | Underground Cable | 115 |
| 19 | NORTH KHOBAR DISTRICT 115/13.8kV SUBSTATION (U/G PORTION) | Al Gihaz | NG | Eastern | Ongoing | Underground Cable | 115 |
| 20 | CONNECTION OF AL NAZEEM S/S 8271, WITH 132KV NETWORK, IN RIYADH CITY | TDP | NG | Centeral | Ongoing | Overhead Lines | 132 |
| 21 | RELIABILITY ENHANCEMENT OF BSP 9014, 9017 & 9027 WITH 132KV NETWORK IN RIYADH AREA. (132kV UNDERGROUND CABLES PORTION) | TDP | NG | Central | Ongoing | Underground Cable | 132 |
| 22 | RELIABILITY ENHANCEMENT OF BSP 9014, 9017 & 9027 WITH 132KV NETWORK IN RIYADH AREA. (132kV UNDERGROUND CABLES PORTION) | TDP | NG | Central | Ongoing | Underground Cable | 132 |
| 23 | RELIABILITY ENHANCEMENT OF BSP 9014, 9017 & 9027 WITH 132KV NETWORK IN RIYADH AREA. (132kV UNDERGROUND CABLES PORTION) | TDP | NG | Central | Ongoing | Underground Cable | 132 |
| 24 | REPLACEMENT OF EXISTING 132KV OIL FILLED CABLES BY XLPE U/G CABLES FOR INTERCONNECTION BETWEEN S/S 8100 & S/S 8102, IN RIYADH AREA (132kV UNDERGROUND CABLES PORTION) | Al Nowaiser | NG | Central | Ongoing | Underground Cable | 132 |
| 25 | REPLACEMENT OF EXISTING 132KV OIL FILLED CABLE BY XLPE U/G CABLES FOR INTERCONNECTION BETWEEN S/S 8005 & S/S 8074 IN RIYADH AREA (132kV UNDERGROUND CABLES PORTION) | Al Nowaiser | NG | Central | Ongoing | Underground Cable | 132 |
| 26 | CONSTRUCTION OF A NEW 110/13.8KV SUBSTATION (KHULAIS-2) IN MAKKAH UNDER NETWORK REINFORCEMENT PROGRAM FOR BIG CITIES (OHTL/UGC) | Al-Gihaz | NG | Western | Ongoing | Overhead Lines | 110 |
| 27 | CONSTRUCTION OF 110/13.8KV SUBSTATION KHULAIS-2 & 110kV INTERCONNECTION IN MAKKAH UNDER NETWORK REINFORCEMENT (SUBSTATION PORTION) | Al-Gihaz | NG | Western | Ongoing | Substations | 110 |
| 28 | CONSTRUCTION OF NEW PROPOSED 110KV UGC DOUBLE CIRCUIT FROM EXISTING MADINAH CENTER BSP (MDC) TO PROPOSED SHORAN -2 S/S | Al-Sharif | NG | Western | Ongoing | Underground Cable | 110 |
| 29 | CONSTRUCTION OF AL NIMAR-2 SUBSTATION SS#8377 WITH 132KV NETWORK IN RIYADH | Al-Sharif | NG | Central | Ongoing | Underground Cable | 132 |
| 30 | CONSTRUCTION OF AL RIMAL SUBSTATION SS#8272 WITH 132KV NETWORK IN RIYADH | Al-Sharif | NG | Central | Ongoing | Underground Cable | 132 |
| 31 | CONSTRUCTION OF AL YASMEEN SUBSTATION SS#8214 WITH 132KV NETWORK IN RIYADH | Al-Sharif | NG | Central | Ongoing | Underground Cable | 132 |
| 32 | CONSTRUCTION OF AL MARWA SUBSTATION SS#8286 WITH 132KV NETWORK CONNECTION | Al-Sharif | NG | Central | Ongoing | Underground Cable | 132 |
| 33 | UPGRADE OF PROTECTION SYSTEM AT 230KV SHEDGUM PP IN AL-HASSA AREA | JAL International | NG | Eastern | Ongoing | Substations | 230 |
| 34 | REFURBISHMENT OF 43BD JUBAIL NORTHEAST SUBSTATION | JAL International | NG | Eastern | Ongoing | Substations | 115 |
| 35 | REFURBISHMENT OF SWGR FOR 6 SUBSTATIONS IN JEDDAH-RFX SUBSTATIONS IN JEDDAH | Al-Fanar | NG | Eastern | Ongoing | Substations | 110 |
| 36 | REINFORCEMENT OF 132/33KV SS 8919 & 8922 IN HAIL | Al-Nowaiser | NG | Central | Ongoing | Substations | 132 |
| 37 | REFURBISHMENT OF HAFAR AL BATIN-1 SUBSTATION IN EASTERN OPERATING AREA | Nour Energy | NG | Eastern | Ongoing | Substations | 115 |
| 38 | DESIGN AND ENGINEERING WORKS REPLACEMENT OF EXISTING WOODEN POLES 115 KV OVERHEAD TRANSMISSION LINES BETWEEN JAWATHA BSP, QARN, SHUBAH & | Al-Haider | NG | Eastern | Ongoing | Underground Cable | 115 |
| 39 | DESIGN AND ENGINEERING WORKS REPLACEMENT OF EXISTING WOODEN POLES 115KV OVERHEAD TRANSMISSION LINES BETWEEN SHEDGUM-2 BSP, HIE 1, UYUN & | Al-Haider | NG | Eastern | Ongoing | Underground Cable | 115 |
| 40 | DESIGN AND ENGINEERING WORKS REPLACEMENT OF EXISTING WOODEN POLES 115KV OVERHEAD TRANSMISSION LINES BETWEEN SHEDGUM-2 BSP, HIE 1, UYUN & JAWATHA BSP SUBSTATIONS | Al-Haider | NG | Eastern | Ongoing | Underground Cable | 115 |
| 41 | DESIGN AND ENGINEERING WORKS REPLACEMENT OF EXISTING WOODEN POLES 115KV OVERHEAD TRANSMISSION LINES BETWEEN SHEDGUM-2 BSP, HIE 1, UYUN & | Al-Haider | NG | Eastern | Ongoing | Substations | 115 |
| 42 | DESIGN AND ENGINEERING WORKS REPLACEMENT OF EXISTING WOODEN POLES 115KV OVERHEAD TRANSMISSION LINES BETWEEN KHURAIS & RWPS 4C SUBSTATIONS IN AL | Al Haider | NG | Eastern | Ongoing | Underground Cable | 115 |
| 43 | DESIGN AND ENGINEERING WORKS REPLACEMENT OF EXISTING WOODEN POLES 115KV OVERHEAD TRANSMISSION LINES BETWEEN KHURAIS & RWPS 4C SUBSTATIONS IN AL | Al Haider | NG | Eastern | Ongoing | Substations | 230 |
| 44 | DESIGN AND ENGINEERING WORKS REPLACEMENT OF ABQAIQ S49 COMMUNITY 115 KV TRANSMISSION LINE | Al Haider | NG | Eastern | Ongoing | Underground Cable | 115 |
| 45 | EPC of Primary Electrical Substation # 1, 2, CC1 and CC2 (380/115/33kV) in Ras El Khair | Royal Commission | NG | Eastern | Completed | Substations | 380 |
| 46 | EPC of Primary Electrical Substation # 3 (380/115/33kV) in Ras El Khair | Royal Commission | NG | Eastern | Completed | Substations | 380 |
| 47 | EPC of 115/13.8kV Substation 26BD (021‐C28) | Royal Commission | NG | Eastern | Completed | Substations | 115 |
| 48 | Construction of new 33/13.8 S/S Sulahi at abha | Giza Systems | NG | Southern | Completed | Substations | 33 |
| 49 | Construction of new 33/13.8 S/S 7826 at Hail | ETAC | NG | Northern | Completed | Substations | 33 |
| 50 | Design Reinforcement of 110kv line feeder from south Azizia to university Substations (SAZ TO UNIV), Area Saudi Arabia; West | BEMCO | NG | Western | Completed | Overhead Lines | 110 |
| 51 | Replacement of 33/13.8KV, 10 MVA Power Transformer at S/S# 7031,7062,7125 by 20 MVA, 33/13.8KV, Ynyno Power Transformer | EPI | NG | Eastern | Completed | Substations | 33 |
| 52 | Upgrading of Transformer Protection Relays in Jubail South East Substation 230/115 kV (#T771, #T741,#T761, #T716) , Jubail Area, Saudi Arabi | ETAC | NG | Southern | Completed | Substations | 230 |
| 53 | Replacement of 33KV & 13.8KV Switchgears at S/S # 7812 Riyadh Area. | ETAC | NG | Centeral | Completed | Substations | 33 |
| 54 | Replacement of 33KV & 13.8KV Switchgears at S/S # 7816 Riyadh Area. | ETAC | NG | Centeral | Completed | Substations | 33 |
| 55 | Design Reinforcement of S/S #7803 & S/S #7804, Saudi Arabia | ETAC | NG | Centeral | Completed | Substations | 33 |
| 56 | Replacement of 13.8 kV Fuji Panels at Substation S/S #8082, Saudi Arabia | ETAC | NG | Centeral | Completed | Substations | 13.8 |
| 57 | Replacement of 13.8KV SWGR for 33/13.8KV‐S/S #7780 & 7751 | ETAC | NG | Centeral | Completed | Substations | 33 |
| 58 | Replacement of AVR Systems for Distribution Substations at Asir and Jazan Regions: a)ASIR HOSPITAL 33 / 13.8 kV Substation | ETAC | NG | Southern | Completed | Substations | 33 |
| 59 | Replacement of AVR Systems for Distribution Substations at Asir and Jazan Regions: b)WADI BIN HASHBEL 33/13.8 kV Substation | ETAC | NG | Southern | Completed | Substations | 33 |
| 60 | Replacement of AVR Systems for Distribution Substations at Asir and Jazan Regions: c)LAJWAN 33/13.8 kV Substation | ETAC | NG | Southern | Completed | Substations | 33 |
| 61 | Replacement of AVR Systems for Distribution Substations at Asir and Jazan Regions: d)NAFIA 33/13.8 kV Substation | ETAC | NG | Southern | Completed | Substations | 33 |
| 62 | Replacement of AVR Systems for Distribution Substations at Asir and Jazan Regions: f)Al‐ Zafeer 33/13.8 kV Substation | ETAC | NG | Southern | Completed | Substations | 33 |
| 63 | Construction of new El‐Koam El‐Ahmer 220/66 KV GIS Electrical Substation | Egyptian Electricity Holding Company | EETC | Egypt | Completed | Substations | 220 |
| 64 | Construction of new Colangeel 66/11KV AIS Electrical Substation Project | Egyptian Electricity Holding Company | EETC | Egypt | Completed | Substations | 66 |