The PROJECT will construct a new 110/33/13.8kV indoor GIS type Substation, arranged in a
double-bus-single breaker configuration in Al-Lith area. The new Substation which shall be
installed by this PROJECT will be fed at HV through Overhead Transmission Line/ underground
circuits from Al-Lith BSP Substation. The new substation shall be equipped with Substation
Automation System (SAS) and will be remotely controlled from the COMPANY Power Control
Center (PCC) through SCADA system, Communication system and gateway